Precast concrete curing is a race against the production schedule. A precast yard wants to strip the moulds early, move the element and cast again the next day. Yet fresh concrete still needs moisture to gain strength and a dense surface. In Egypt’s hot, dry and windy yards, that surface can dry out within hours. This guide covers a curing and protection coat applied right after de-moulding, and a coating that protects timber forms over many casts.

On a building site, a slab can stay under wet hessian or plastic for a week. In a precast plant, that rarely happens. Elements leave the mould early, often after heat or steam curing, and then sit in the open yard.

Several problems follow from this:

  • the surface loses water quickly in sun and wind;
  • water curing every element by hand is hard to supervise;
  • plastic sheets blow away or get damaged during lifting;
  • a weak, porous skin forms on the face that later meets soil, water or salts.

That skin matters most for tunnel segments, culverts, manholes and marine units. These elements spend their whole life in contact with groundwater, sewage or seawater. So a precast concrete curing method that also seals the surface makes sense. For the general principles, ACI Committee 308, Curing Concrete publishes the main guides.

Sikagard-65 WN MY from Sika is a solvent-free, water-dispersed, two-part epoxy. Its sheet describes it for curing and protection of precast concrete segments immediately after de-moulding. It also presents it as an alternative to conventional curing and protection procedures. According to the sheet, the resin penetrates the concrete surface and forms a barrier against the ingress of aggressive ions.

PropertySikagard-65 WN MY (data sheet)
TypeWater-dispersed two-part epoxy, solvent free
ColoursWhite, light grey, grey (others on request)
Mixing ratioPart A : B = 3 : 1 by weight
Pack30 kg set (22.5 kg A + 7.5 kg B)
Density (A+B)About 1.4 kg/l at +20 °C
Solids by volumeAbout 52%
Adhesion to concrete> 1.5 N/mm², concrete failure
Pot lifeAbout 35 minutes
Substrate temperature+70 °C maximum

The adhesion value comes from the pull-off method in ASTM D4541. Note also the substrate limit of +70 °C. It matters for elements that come warm out of heat-cured moulds.

A typical membrane-forming curing compound only slows water loss during early hardening. ASTM C309 is the usual specification for that type. Sikagard-65 WN MY goes a step further, because the sheet lists pore sealing and higher chemical and abrasion resistance. However, its sheet does not claim compliance with ASTM C309. So if a project specification calls for C309 by name, the engineer should confirm acceptance first.

The sheet keeps the method simple, but the timing rules are strict.

First, the surface must be dry and free of loose cement particles. Then the crew stirs Part A with an electric mixer at low speed, about 600 rpm. Next, they add Part B and mix for 2 to 3 minutes, until the colour is uniform.

  • Primer coat: about 100 g/m², diluted with 8 to 10% clean water.
  • Following coats: 100 to 250 g/m² per coat, undiluted.
  • Minimum build-up: at least two coats, not counting the primer.

The number of coats depends on the dry film thickness that the project requires. Application is by brush or roller only, since the sheet does not recommend spraying.

The end of pot life cannot be seen or felt. Therefore, the team must time each mix and discard it at about 35 minutes. In addition, the second coat goes on only after the first is tack-free. The gap between coats must not exceed 3 days.

At 85% RHBefore transporting segmentsFully cured
+20 °CAbout 12 hoursAbout 10 days
+30 °CAbout 4 hoursAbout 7 days

At +30 °C, the minimum overcoating time is about 4 hours. Ambient temperature, humidity and wind all change these times. Finally, tools clean with water straight after use, while hardened material comes off only mechanically.

Precast concrete curing also depends on the moulds. Rough, swollen or chipped timber forms spoil the face of every element cast in them.

MasterFinish PT 100 from Master Builders Solutions, the former BASF construction chemicals brand, is a one-component, moisture-curing polyurethane lacquer. Its sheet describes it as a permanent protective coating for wood forms in precast and prestressed plants. It also lists concrete forms and ornamental concrete. In addition, the sheet says the coating protects end grain from cracking and chipping, and resists alkaline concrete.

PropertyMasterFinish PT 100 (data sheet)
TypeOne-component, moisture-curing polyurethane
UsePlants only; precast, prestressed and ornamental concrete
Yield4.9 to 6.1 m²/L
Solids40%
Tensile strength33 MPa (ASTM D412)
Elongation100%
Packaging18.9 L pails
  1. Clean and dry the form; sand rough timber smooth.
  2. Apply the first coat by brush or roller, straight from the can.
  3. If the grain rises, sand lightly before the second coat.
  4. Apply the second coat within 24 hours, without thinning.

The 24-hour limit is important. After that, the sheet says the film becomes too hard to bond to itself unless heavily abraded. Also, the sheet advises against coating over an existing coating, which may delaminate.

The product cures with air moisture. So the crew withdraws only one day’s quantity, closes the container straight away, and never pours leftovers back. Its VOC content is 583 g/L, and the sheet warns that mixing raises flammable vapours. As a result, good ventilation and no open flames are basic rules in the form shop.

Target applies protective coatings for concrete across Egypt. For precast work, a typical sequence, adjusted to each specification, looks like this:

  1. Coat new or refurbished timber forms with MasterFinish PT 100 well before casting.
  2. Cast, compact and finish the element as specified.
  3. De-mould, then check the surface for loose particles and standing water.
  4. Prime with diluted Sikagard-65 WN MY, then apply at least two full coats.
  5. Respect the pot life and the 3-day maximum gap between coats.
  6. Hold elements until the curing time listed for the yard temperature.
  7. Record batch numbers, coat counts and consumption for each element.
  • Leaving stripped elements bare in the sun “until the crew is free”.
  • Spraying the epoxy curing coat, which the sheet does not recommend.
  • Using a mix after its pot life because it still looks liquid.
  • Lifting and transporting segments before the listed curing time.
  • Recoating form lacquer after 24 hours without abrading it.
  • Returning unused form lacquer to the original container.

The sheet presents it as an alternative to conventional curing and protection procedures. Still, the project engineer decides the curing method, especially where the specification names one.

Its sheet targets precast segments in aggressive environments. For the waterproofing around the tunnel lining itself, see our guide to PVC tunnel waterproofing membranes.

No. The sheet describes a protective coating for the form itself. So the plant keeps its normal release practice unless the specifier says otherwise.

The sheet gives different readiness times in different sections, from a couple of hours to the next day. At Target we follow the stricter one and return forms to service the day after the second coat.

Precast concrete curing works best when the plant plans it as part of the production cycle. A water-based epoxy coat after de-moulding protects early moisture and seals the surface, as long as the team respects pot life and coat timing. Protected timber forms then give sound faces over many casts.