A food factory floor coating has to do more than look clean. It must resist daily wash-down, spills of fats and acids, and steady forklift traffic. In Egypt, dairies, bakeries, beverage plants and pharmaceutical factories face strict hygiene audits. As a result, the floor is often the first surface an inspector checks. This guide compares resin systems whose data sheets name these industries directly.

Auditors look for floors that are seamless, non-absorbent and easy to clean. Open joints, cracks and broken tiles trap residue and bacteria. Likewise, worn concrete releases dust and absorbs spills.

Food safety principles therefore favour continuous resin floors. In pharmaceutical plants, the bar rises further. ISO 14644 classifies clean rooms by airborne particles, and good manufacturing practice adds its own expectations. So the floor itself must not shed particles.

Not every area in a plant needs the same floor. For example, a dry packing hall faces mostly trolley traffic. In contrast, a dairy processing area stays wet for most of the day, and crews hose it down often.

Wet zones need slip resistance and full resistance to water and cleaning chemicals. Hot zones, such as areas near ovens or hot-water wash-down, need heat resistance as well. Dry zones, meanwhile, can take a smoother, easier-to-clean finish. Mapping these zones early leads to a better food factory floor coating specification.

The data sheets below each list food or pharmaceutical uses.

ProductTypeKey data from the sheet
MasterTop 1110 (Master Builders, now Sikafloor-1110)Water-dispersible epoxy coatingApplicable to damp concrete; non-tainting; 75–100 µm DFT per coat; max service 60 °C
MasterTop 1207 (Master Builders, now Sikafloor-1207)High-build solvent-free epoxyAnti-slip finish for wet areas; 85 N/mm² compressive (ASTM D695); Shore D 74
Rayston Floor 1175 (Krypton Chemical)Hygienic, anti-slip epoxy65 N/mm² compressive (ASTM C579); bond 2.5 N/mm² (concrete failure); Shore D 75
Sikafloor-264 (Sika)Epoxy roller and seal coatISO 14644-1 class 4 and GMP class A statements; permanent dry heat +50 °C
Kemcrete SL (Prokem)Self-levelling epoxy mortarHeat resistance from −40 to +120 °C, per its Arabic sheet

MasterTop 1110 stands out for wet-process plants. Its sheet states that it can go on damp concrete and will not taint foodstuffs. In addition, it lists dairies, abattoirs, bakeries, pharmaceutical factories and commercial kitchens. The sheet gives two coats, with a recoat time of 10 hours minimum and 48 hours maximum at 25 °C.

MasterTop 1207 and Rayston Floor 1175 both offer slip-resistant finishes. The Rayston sheet lists food and beverage plants such as bakeries, dairies and soft drink makers. Similarly, the MasterTop 1207 sheet mentions food processing and wet areas.

Sikafloor-264 suits pharmaceutical and clean room areas. Its sheet cites ISO 14644-1 class 4 and GMP class A qualifications. However, its permanent dry heat limit is +50 °C. Where floors face higher heat, a heat-resistant mortar such as Kemcrete SL is worth considering. Its Arabic sheet gives headline claims only, so we confirm full data with the supplier.

Food plants rarely use harsh industrial acids, yet they do spill milk, juices, sugars and cleaning agents every day. The Rayston Floor 1175 sheet lists spill tests: sugar solution, citric acid 10% and acetic acid 10% showed no effect. However, lactic acid 10% caused a colour change. That matters in dairies, where lactic acid is common. So, for every food factory floor coating, compare the plant’s actual chemicals with the resistance table in the sheet.

Above all, the concrete must be sound and clean. The MasterTop 1207 sheet asks for concrete at least 28 days old with moisture up to 4%, primed with MasterTop 1200. Likewise, Rayston Floor 1175 and Sikafloor-264 both call for moisture below 4%.

Food plants add another challenge: oil and fat soaked deep into old concrete. Therefore, contaminated areas may need deep grinding or replacement before coating.

Hygiene often fails at edges. A sharp floor-to-wall corner collects dirt, so designers usually specify a coved skirting. Moreover, drains and channels need a gap-free bond to the floor.

Key details include:

  • Coved upstands at walls and plinths.
  • Sealed edges around drains, gullies and channels.
  • Correct falls so water does not pond.
  • Flexible sealing at movement joints, never coated over.

Target crews usually follow this sequence, adapted to the plant’s schedule and specification:

  1. Map wet, dry and hot zones with the plant team.
  2. Test concrete strength and moisture, and check for oil contamination.
  3. Prepare the surface mechanically and vacuum it clean.
  4. Repair defects and form coves and drain details.
  5. Prime as the system data sheet requires.
  6. Lay the body coats and broadcast anti-slip aggregate in wet zones.
  7. Seal and finish, then cut and seal movement joints.
  8. Allow full cure before wash-down and production.

Timing matters in a running plant. For instance, MasterTop 1207 gives 18–36 hours between coats and full cure after 7 days. Rayston Floor 1175 also reaches full cure after 7 days. Planning shutdowns around these times avoids rushed handovers.

Most plants cannot stop for weeks. Therefore, we usually split the floor into phases, isolating each zone from production. Dust from grinding needs extraction, and odour matters near open food. In this respect, MasterTop 1110 is solvent-free, and its sheet reports a minimal risk of tainting foodstuffs during and after cure.

  • Using one floor for wet, dry and hot zones alike.
  • Coating oil-soaked concrete without deep cleaning.
  • Leaving square corners instead of coves.
  • Exceeding the heat limit of the chosen resin.
  • Starting wash-down before full cure.
  • Mixing products from different systems without approval.

Some can. According to its sheet, MasterTop 1110 is a water-based epoxy that tolerates damp concrete. Most solvent-free epoxies, however, need moisture below 4%.

Sikafloor-264 carries ISO 14644-1 class 4 and GMP class A statements in its sheet. Still, the full clean room specification should come from the plant’s design team.

Check the heat limit first. MasterTop 1110 lists 60 °C maximum service temperature. For higher heat, Kemcrete SL’s sheet claims resistance up to +120 °C.

Usually we advise against it. Broken or loose tiles trap water and residue beneath them, and the coating then fails on top. So we prefer to remove the tiles and reach sound concrete, unless the system supplier approves otherwise in writing.

Follow the cleaning regime in the system sheet. For example, Sika refers to its own Sikafloor cleaning regime for Sikafloor-264.

A good food factory floor coating starts with zoning: wet, dry and hot areas each need a matched system. Sound concrete, coved details and full cure then complete the job.

Target delivers epoxy flooring works and MMA floors for industrial clients in Egypt. Browse our chemical-resistant flooring articles, or contact Target to plan a floor around your production schedule.

For background, Wikipedia covers food safety.

No comment

Leave a Reply

Your email address will not be published. Required fields are marked *