District 5 residences – District 5 Mindhaus – District 5 mall
District 5 – Marakez
District 5 residences – District 5 Mindhaus – District 5 mall
Target Engineering delivered comprehensive waterproofing and flooring solutions for District 5, a mixed-use development encompassing residences (Mindhaus), retail (District 5 Mall), and public spaces. Key components include:
Project Description
- Roofing:
- Combo Roof System: A multi-layered system integrating thermal insulation (XPS/PU foam) and waterproofing membranes (EPDM/PVC) for energy efficiency and weather resistance.
- Parking & Garages:
- Epoxy Flooring: Heavy-duty, chemical-resistant epoxy coatings applied to parking floors to withstand vehicular traffic, oil spills, and abrasion.
- Water Features & Landscaping:
- Polyurea Waterproofing: Cold-applied polyurea membranes for fountains, ponds, and landscape elements, ensuring flexibility and UV resistance.
- Wet Areas:
- Cementitious Coatings: Breathable, waterproof coatings for bathrooms, basements, and utility areas to prevent moisture ingress and mold growth.
ClientMARAKEZ
LocationNew Cairo
Year Completed1 March 2022
Surface Area2,000 m2
Websitemarakez-360.com
No comment